CorCoat has completed the manufacturing of a 2 m³ GRP-FRP phosphoric acid overflow tank.
The company that exports the most in its field to countries such as Russia, Sweden, Norway, Finland, South America, etc.!

CorCoat has successfully completed the supply of GRP-FRP pipes and the on-site installation works as part of the construction of the Linear Kostik Soda Inc. Chlor-Alkali Plant.

The PVC + GRP-FRP pipe pre-manufacturing and on-site installation works have been successfully completed as part of the PVC + GRP-FRP piping revision works for the Socar Petkim Demi Unit.

The GRP-FRP piping revision and installation works for the reactor cooling water dosing unit of the Akkuyu Nuclear Power Plant UPK50 Unit have been successfully completed by CorCoat.

CorCoat has completed the GRP-FRP piping revision and installation works as part of the maintenance activities for the seawater cooling water lines at İzDemir Enerji Inc.

CorCoat has completed the supply of new manholes and the GRP-FRP lamination installation works for the 12 GRP-FRP units currently in operation at the Potassium Unit of Solufert Kimya Inc.

The GRP-FRP line revision and maintenance works at the BOTAŞ A.Ş IPT1 Pressure Reduction Station – Erzin have been successfully and promptly completed by CorCoat.

CorCoat provided on-site services to Ersel Heavy Machinery Industry for a project involving a total of six cold-applied rubber linings for mill liners, with diameters of 9,150 mm, 6,200 mm, and 4,700 mm.

To protect mill screens from wear and tear, mill screens of various sizes, such as 5800 mm and 3800 mm in diameter, have been coated with NR and SBR-based rubber and cured for 24 hours or more using the free steam vulcanisation method.

Mining sector Cast beams with 6-10 mm thick wear-resistant rubber coating and vulcanisation processes were carried out by CorCoat and shipped to Metso in Germany.

In our 2,000 m² closed facility located in the Industrial Zone, we have manufactured numerous different autoclave-vulcanised rubber-coated parts for Metso to be used in the Russian mining sector.

All stages, from sandblasting prior to coating to vulcanisation, are monitored with quality reports and presented to the customer.

CorCoat has completed the internal surface wear-resistant rubber lining works on two steel-fabricated slurry tanks, each with a diameter of 5,400 mm and a height of 8,500 mm.

To date, CorCoat has successfully completed wear-resistant rubber lining works on hundreds of different steel fabrication designs using the autoclave vulcanization method.

A total of 46 pieces of equipment belonging to Solufert have been coated with 6 mm thick ebonite rubber on their inner surfaces, with the work completed on site.

Equipment coated with Shore-D 70 +/-5 hardness using autoclave vulcanisation are resin ion exchanger equipment in the Chlor-Alkali Plant, and details such as filter holes and other connections are coated with precision.

Rubber coating and autoclave vulcanisation work with a thickness of 6-12 mm to protect the inner surfaces of existing reduction and tee fittings in cooling lines from corrosion and wear.

Solufert Kimya Inc. has completed the manufacture of 4 mm polypropylene + 20 mm GRP-FRP chemical recycling storage tanks for use in its Potassium Unit.

CorCoat has completed the manufacture of 6 mm PVC + 3 mm GRP-FRP HCl storage tanks for use at the Solufert Kimya Inc. Chlor-Alkali Plant.

All internal surfaces of the 50 m³ GRP-FRP tanks have undergone GRP-FRP lamination renewal. Additional fittings have been supplied and installed, and the external gelcoat renewal and maintenance works have been successfully completed.

CorCoat has completed the manufacturing of a 2 m³ PVC + GRP-FRP HCl storage tank. SIMONA brand PVC sheets were used in the production, and vinyl ester resin was selected to ensure high chemical resistance and long service life.

CorCoat has completed the manufacturing of a 2 m³ GRP-FRP phosphoric acid overflow tank.

CorCoat has completed the manufacturing of a 6 m³ GRP-FRP HCl storage tank along with its associated GRP-FRP overflow basin.

CorCoat has completed the GRP-FRP coating and lamination works on the internal surfaces of the cathodic dip coating steel tanks at the Renault Bursa automotive factory.

The Mercedes Aksaray automobile factory has completed the inspection and maintenance work on the inner surface GRP-FRP coating lamination of the cathodic dip coating steel tanks.

CorCoat has completed the GRP-FRP laminate coating inspection of the inner surfaces of Akdeniz Chemson's chemical wastewater treatment tanks.

The GRP-FRP coating lamination work on the inner surfaces of Akdeniz Chemson's chemical wastewater treatment tanks has been completed by CorCoat.

CorCoat has completed maintenance and refurbishment work on a total of 240 GRP-FRP blades for the cooling water towers at İzDemir Energy Electricity Production Inc.

A 5-6 mm thick vinyl ester resin and glass fibre composite coating has been applied to the inner surfaces of the existing chemical waste line in the waste disposal unit.

CorCoat is proud to have completed the material supply and labor services for the cryogenic insulation GRP-FRP coating and on-site installation work on the LNG Croatia vessel.

Due to the rapid deterioration of the existing coating applied to the chemical waste channels in the DEMİ Unit of Solufert Kimya Inc., a special PP sheet coating material supply and labor service was provided.

The existing HCl tanks, concrete spill ponds, and pump station floors at the Potassium Unit of Solufert Kimya Inc. have been coated with acid-resistant ceramic tile material supplied and installed by CorCoat.

The concrete floors of the production area at Solufert Kimya Inc.'s Chlor-Alkali Unit, where acidic and basic process equipment is located, have been covered with acid-resistant ceramic tile material and labor services.

At Solufert Kimya Inc.'s Potassium Unit, defects on the existing concrete surfaces were repaired with flexible mortar, and after leveling, ceramic tile installations were completed using resin-based mortar.

The steel dosing tank frames currently in use at the Potassium Unit of Solufert Kimya Inc. have been coated with PP sheet material supplied and installed by CorCoat to provide corrosion protection.

The existing production area at the Potassium Unit of Solufert Kimya Inc. has been coated with non-slip epoxy material supplied and applied by the company.

The existing production area concrete surfaces at Solufert Kimya Inc.'s Chlor-Alkali Unit have been coated with epoxy material supplied and applied by CorCoat.

A.Ş
We would like to thank you for the application of bisphenol-A vinyl ester resin and glass fibre coating to protect the turbine blade frames from corrosion in seawater.

A.Ş





Thank you for the supply of materials and labour services for the closed-loop chemical cleaning of the boiler pipes with HCl and citric acid for the 65 cubic metre steam boiler.