From GRP-FRP and rubber coating to steel piping and thermoplastic equipment, we deliver our engineering solutions with quality and reliability.
With engineering experience dating back to the 1980s, CorCoat was established in Aliağa, İzmir in 2017 and operates in the field of industrial coating and manufacturing. At our 5,000 m² factory in ALOSBİ, we produce solutions that comply with ASTM, DIN and ISO standards. We have proven our reliability by working with leading companies in the sector such as SOCAR, Petkim and EnerjiSA, and we began exporting to Europe in 2022.
















We provide a wide range of services including piping, installation, coating and chemical cleaning.
We play an active role in numerous projects, including food, iron and steel, chemical and petrochemical factories, etc.
We are shaping transport with our professional work on railway and road projects.
We have successfully made a name for ourselves in numerous projects, including hydroelectric power plants, thermal power plants.
We ensure the smooth operation of major environmental projects such as Wastewater Treatment Plants and Drinking Water Pipelines.
We bring your projects to life with our expert team and high quality standards.
The company that exports the most in its field to countries such as Russia, Sweden, Norway, Finland, South America, etc.!

The piping revision and installation works for the reactor cooling water dosing unit of the Akkuyu Nuclear Power Plant UPK50 Unit have been completed by CorCoat.

Corcoat provided on-site services to Ersel Heavy Machinery Industry for a project involving a total of six cold rubber linings for mill liners, with diameters varying between 9,150 mm, 6,200 mm, and 4,700 mm.

Equipment coated with Shore-D using autoclave vulcanisation are resin ion exchanger equipment in the Chlor-Alkali Plant, and details such as filter holes and other connections are coated with precision.

CorCoat is proud to have completed the material supply and labour services for the cryogenic insulation-free GRP-FRP coating and field installation work on the LNG Croatia vessel.
We establish our work processes using appropriate techniques, identifying potential issues in advance and developing solution-oriented approaches. We successfully implement your projects by prioritising quality, safety and efficiency at every step.
Appropriate technical methods are determined for the project, the workflow is designed, and specialist teams are assigned to the process.
The planned process is implemented through technical drawings and engineering applications, with each step meticulously modelled.
Completed tasks are analysed and undergo quality control. Processes are continuously monitored and improved for maximum efficiency.